You have reached the Request for Quote (RFQ) page for part number CK-104 LONG LEAD, an item sourced from Crl Components Inc (CAGE Code 71590) that is classified with the item name Capacitor Fixed Cer. Here, you can utilize our online form to quickly secure tailored pricing and procurement options from our staff as the first step of procurement. With responses always being quick, be sure to get started as soon as possible if you would like to learn more about this part number.
Important Details for Part Number CK-104 LONG LEAD
The part number CK-104 LONG LEAD is associated with Crl Components Inc, identified by the CAGE Code 71590, and is typically referenced under the item name Capacitor Fixed Cer. It is categorized under the NSN 5910-00-113-5499, with the NIIN 001135499, INC 00007, and NCB code 00 (USA). Additionally, this part falls under the Federal Supply Group (FSG) 59 and Federal Supply Class (FSC) 5910 Capacitors. For more information, these classifications provide further context about the component.
With the form provided, be sure to present our staff with key details on your needs, such as your target pricing, required quantity, and expected turnaround time. Once we receive and review your request for part CK-104 LONG LEAD, a member of our staff will contact you in 15 minutes or less to present customized solutions for your comparisons. Once you make a purchase with us, you can expect our staff to work closely with you through each step of fulfillment to ensure that all needs are met with care and efficiency.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
0160-5216 | E | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL S ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM MLRS |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | 25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | 55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | 10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
![]() |
AS9120B and ISO 9001:2015 |
![]() |
Aviation Suppliers Association Member |
![]() |
FAA AC 0056B Accredited |
![]() |
AS 6081:2012 Certification |
![]() |
ESD S20.20-2014 Certification |
Before You Go, Take a Look at Our NSN Parts Catalog! Don’t forget That We Can offer A Competitive Quote Within 15 Minutes of Receiving Your RFQ form!
Request for Quote