CK-104 LONG LEAD by Crl Components Inc - Receive a Competitive Quote
Part Number: CK-104 LONG LEAD | Alternate P/N: CK104LONGLEAD | Manufacturer: Crl Components Inc | NSN : 5910-00-113-5499 | Item Name : Capacitor Fixed Cer | CAGE Code: 71590 | FSC : 5910 Capacitors | ||
We’re excited to announce that CK-104 LONG LEAD NSN part is now available and ready for immediate shipping. Part number CK-104 LONG LEAD is a Capacitor Fixed Cer manufactured by Crl Components Inc with NSN 5910001135499. Are you interested in a quick and competitive quote for this part?
Just NSN Parts, owned and operated by ASAP Semiconductor, is a leading distributor of NSN (National Stock Number) parts, new and obsolete. Because of our dedication to quality, we’re the only independent distributor in the United States with a strict No China Sourcing Pledge. We’re also an AS9120B, ISO 9001:2015 certified, and FAA AC 0056B accredited member of the Aviation Suppliers Association (ASA). Our vast and comprehensive inventory of over 2 billion parts coupled with our shipping facilities in Washington, Oregon, California, New Maxico, Nevada, Arizona, Illinois, Minnesota, Pennsylvania, and New York, allow us to offer you some of the fastest delivery times in the industry.
If you’d like to learn more about NSN part number CK-104 LONG LEAD Capacitor Fixed Cer, feel free to call us at our toll-free number, +1-714-705-4780, or email us at sales@justnsnparts.com. And, if you’d like to stay informed on new inventory or any promotions, feel free to download the ASAP Semiconductor App from Google Play or the App Store.
NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
0160-5216 | E | 1 | C | A |
Characteristics Data of NSN 5910-00-113-5499, 5910001135499
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL S ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM MLRS |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | 25.0 TO 15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | 55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | 10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION INCLUDES ENGINEERING TYPE BULLETINS,BROCHURES,ETC.,THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS,INDUSTRY DIRECTORIES,AND SIMILAR TRADE PUBLICATIONS,REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |