DD101 LONG LEAD by Crl Components Inc - Receive a Competitive Quote
Part Number: DD101 LONG LEAD | Alternate P/N: DD101LONGLEAD | Manufacturer: Crl Components Inc | NSN : 5910-00-678-8157 | Item Name : Capacitor Fixed Cer | CAGE Code: 71590 | FSC : 5910 Capacitors | ||
We’re excited to announce that DD101 LONG LEAD NSN part is now available and ready for immediate shipping. Part number DD101 LONG LEAD is a Capacitor Fixed Cer manufactured by Crl Components Inc with NSN 5910006788157. Are you interested in a quick and competitive quote for this part?
Just NSN Parts, owned and operated by ASAP Semiconductor, is a leading distributor of NSN (National Stock Number) parts, new and obsolete. Because of our dedication to quality, we’re the only independent distributor in the United States with a strict No China Sourcing Pledge. We’re also an AS9120B, ISO 9001:2015 certified, and FAA AC 0056B accredited member of the Aviation Suppliers Association (ASA). Our vast and comprehensive inventory of over 2 billion parts coupled with our shipping facilities in Washington, Oregon, California, New Maxico, Nevada, Arizona, Illinois, Minnesota, Pennsylvania, and New York, allow us to offer you some of the fastest delivery times in the industry.
If you’d like to learn more about NSN part number DD101 LONG LEAD Capacitor Fixed Cer, feel free to call us at our toll-free number, +1-714-705-4780, or email us at sales@justnsnparts.com. And, if you’d like to stay informed on new inventory or any promotions, feel free to download the ASAP Semiconductor App from Google Play or the App Store.
NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
108-703-1019 | 3 | 1 | C | A |
Characteristics Data of NSN 5910-00-678-8157, 5910006788157
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES,RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABKW | UNABLE TO DECODE | UNABLE TO DECODE |
ABMK | UNABLE TO DECODE | UNABLE TO DECODE |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S |
AGAV | END ITEM IDENTIFICATION | MISSILE,AI-TO-AIR,PHOEBNIX AIM-54 ; TELETYPE,MODEL 28; TEST CONSOLES,MINI-SACE; ENGINE,AIRCRAFT TF33-PW-102 C-135E,EC-135H/K/P ; MISSILE,AIR-TO-AIR,SPARROW AIM-7 ; SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT,B |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | 56.0/22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | 55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | 10.00 TO 10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |