DD101 LONG LEAD by Crl Components Inc - Receive a Competitive Quote

Part Number:  DD101 LONG LEAD
Manufacturer:  Crl Components Inc
NIIN:  00-678-8157
Item Name :  capacitor fixed cer
CAGE Code:  71590
INC Code :  00007
Country:  USA
NCB Code:  00

You have reached the Request for Quote (RFQ) page for part number DD101 LONG LEAD, an item sourced from Crl Components Inc (CAGE Code 71590) that is classified with the item name Capacitor Fixed Cer. Here, you can utilize our online form to quickly secure tailored pricing and procurement options from our staff as the first step of procurement. With responses always being quick, be sure to get started as soon as possible if you would like to learn more about this part number.

Important Details for Part Number DD101 LONG LEAD

The part number DD101 LONG LEAD is associated with Crl Components Inc, identified by the CAGE Code 71590, and is typically referenced under the item name Capacitor Fixed Cer. It is categorized under the NSN 5910-00-678-8157, with the NIIN 006788157, INC 00007, and NCB code 00 (USA). Additionally, this part falls under the Federal Supply Group (FSG) 59 and Federal Supply Class (FSC) 5910 Capacitors. For more information, these classifications provide further context about the component.

Note : We Will Not Share Your Information To Any Third Parties.

Please fill out below form for DD101 LONG LEAD

Contact Information

“*” Required Fields Are Compulsory
   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

Disclaimer: This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/customer-terms-and-conditions/ . All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without 6RE77 is void.

How to Request a Quote on Part Number DD101 LONG LEAD

With the form provided, be sure to present our staff with key details on your needs, such as your target pricing, required quantity, and expected turnaround time. Once we receive and review your request for part DD101 LONG LEAD, a member of our staff will contact you in 15 minutes or less to present customized solutions for your comparisons. Once you make a purchase with us, you can expect our staff to work closely with you through each step of fulfillment to ensure that all needs are met with care and efficiency.


NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-678-8157

Item PartTypeName:

CAPACITOR,FIXED,CERAMIC DIELECTR

59100067881570P
CIICHCCESDPMICCriticalityENAC
UA0
Part NumberISCRNVCRNCCHCCMSDSSADC
108-703-101931CA

Characteristics Data of NSN 5910-00-678-8157, 5910006788157

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES,RADIAL TERMINALS
AARGRELIABILITY INDICATORNOT ESTABLISHED
ABJTTERMINAL LENGTH1.500 INCHES MINIMUM
ABKWUNABLE TO DECODEUNABLE TO DECODE
ABMKUNABLE TO DECODEUNABLE TO DECODE
ABPMBODY DIAMETER0.290 INCHES MAXIMUM
ADAQBODY LENGTH0.156 INCHES MAXIMUM
AEBSCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER0.250 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE S
AGAVEND ITEM IDENTIFICATIONMISSILE,AI-TO-AIR,PHOEBNIX AIM-54 ; TELETYPE,MODEL 28; TEST CONSOLES,MINI-SACE; ENGINE,AIRCRAFT TF33-PW-102 C-135E,EC-135H/K/P ; MISSILE,AIR-TO-AIR,SPARROW AIM-7 ; SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT,B
CQBQCAPACITANCE VALUE PER SECTION100.000 PICOFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE56.0/22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION1000.0 DC SINGLE SECTION
CRTLCRITICALITY CODE JUSTIFICATIONFEAT
CRTPTOLERANCE RANGE PER SECTION10.00 TO 10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP10000.0 MEGOHMS
CWSGTERMINAL SURFACE TREATMENTSOLDER
FEATSPECIAL FEATURESWEAPON SYSTEM ESSENTIAL
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD

ASAP Semiconductor’s Certifications and Memberships



manf_ OVER 75000
MANUFACTURERS
on_time_del Same-day
and next-day delivery
comp_purchasing COMPLETE PURCHASING
SOLUTIONS
certification_ FULLY CERTIFIED
MATERIAL
comp_prices COMPETITIVE
PRICES

Thank You for Visiting!

Before You Go, Take a Look at Our NSN Parts Catalog! Don’t forget That We Can offer A Competitive Quote Within 15 Minutes of Receiving Your RFQ form!

Request for Quote

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.

bottom to top